Results:
Project Cost: $109,900
Annual Savings:
• $39,000 in energy costs per year
• $33,000 from gas radiant heating
• $7,000 through power factor correction
• Maintenance savings of $2,000 per year
Payback: 2.7 years
At A Glance:
The Facility: Two plants for a total of 110,000 square feet
Service: Performance Design Build
Upgrades:
Replaced boiler and shop unit heaters with high-efficiency, gas-fired radiant tube IR heaters
Installed 250kVAR detuned capacitor bank to correct power factor to 92%
 
“Passing higher energy costs on to our customers was not an option. Toronto Hydro Energy Services provided us with the best proposal to reduce our energy costs and backed it up with performance guarantees”
- Lakis Georgiou, President and CEO of Alumicor Limited
At its two Toronto plants, Alumicor manufactures architectural building products, windows, storefronts and doors, for sale throughout North America. Twice named one of Canada's 50 Best Managed Companies, Alumicor has been recognized for its innovation and world-class best business practices. So it's not surprising that Alumicor president and CEO Lakis Georgiou quickly recognized the challenge that rising energy prices posed and called in Toronto Hydro Energy Services - the energy efficiency experts. Alumicor wanted to lower its plants' energy load while improving overall energy performance.

Identified improvements
After conducting a thorough Energy Audit of the facilities, Toronto Hydro Energy Services identified a number of opportunities for improvement. Two areas offered Alumicor the greatest return on investment with substantial energy savings in the first year and a full recovery of project costs in well under three years.

High-efficiency gas-fired radiant tube heating was installed to replace the boiler and shop unit heaters for an estimated natural gas savings of 91,000 cubic metres per year. In addition, a further $2,000 a year in heating system maintenance costs was eliminated with the introduction of the new radiant tube heating system.

Power factor, which measures the actual performance of the power received by the facility, was found to be deficient. By installing power factor capacitors, Toronto Hydro Energy Services was able to raise the power factor to 92% and deliver an estimated $6,700 per year in electricity savings.

Full project management and guaranteed results
Energy efficiency improvements at Alumicor were conducted under Toronto Hydro Energy Services, Performance Design Building service. Beginning with an in-depth energy audit and analysis, the service provides a complete turnkey project solution including all engineering designs and implementation, total management of the project and post-project implementation. Furthermore, the proposed energy performance improvements come with guarantees. If 85% of the estimated energy savings are not realized in the first year, Toronto Hydro Energy Services will make up the difference.